National Development Plans
The National Development Plan is drawn up by GAZ-SYSTEM for a period of 10 years in accordance with Article 16(2) of the Energy Law; GAZ-SYSTEM is also the entity responsible for planning the development of the Transit Gas Pipeline System.
The development plan is prepared based on the guidelines:
The following documents and studies were used in the preparation of the development plan:
The development plan is prepared based on the guidelines:
- Energy and Climate Policy of the European Union;
- Energy and Climate Policy of Poland (including PEP 2040 and NAP 2021-2030);
- The Concept for Spatial Development of the Country;
- Legal acts of the European Union (in particular, SoS Regulations).
The following documents and studies were used in the preparation of the development plan:
- The forecast of demand for gas transmission service in Poland until 2045 (GAZ-SYSTEM study of 2023);
- Ten-Year Transmission System Development Plan (TYNDP 2022), prepared by ENTSOG;
- Agreed with the ERO President - TYNDP for 2022-2031 Part A (decision DRG.DRG-3.4311.16.2021.RTu of October 29, 2021);
- GAZ-SYSTEM Investment Plan for 2023-2025;
- Reporting data for 2022.
National Development Plan GAZ-SYSTEM 2025-2034 Part B (PL)
National Development Plan GAZ-SYSTEM 2024-2033 Part A (PL)
National Development Plan GAZ-SYSTEM 2024-2033 Part B (PL)
National Development Plan GAZ-SYSTEM 2022-2031(PL)
National Development Plan GAZ-SYSTEM 2020-2029 (PL)
National Development Plan GAZ-SYSTEM 2018-2027 (PL)
National Development Plan GAZ-SYSTEM 2016-2025 (PL)
National Development Plan GAZ-SYSTEM 2014-2023 (PL)