Data transparency
Regulation (EC) 715/2009. |
Link |
Additional information |
in Art. 18, in paragraph 4: | ||
Points of the transmission system subject to the public disclosure obligation |
Decision of the ERO President approving the updated list of relevant points(PL) |
|
Annex to Regulation 715/2009 |
Link |
Additional information |
3.1.2 a) |
||
Detailed and comprehensive description of the different services offered and the related charges. |
Detailed information on the services provided is available in the TNC. |
|
3.1.2 b) u. c) 1. |
||
Applications for provision of the NTS transmission service and for definition of the NTS connection conditions, NTS transmission contract and other important documents. | ||
3.1.2 c) |
||
NTS Transmission Network Code and / standard conditions defining the rights and obligations of all network users. | TNC | |
3.1.2 c) 2. |
||
Quality parameters of transported gaseous fuel. | ||
3.1.2 c) 3. |
||
Pressure requirements for all relevant points. | ||
3.1.2 c) 4. |
||
The procedure to be followed in the event of interruption of interruptible transmission service. | TNC | The procedure is described in detail in point 7.2 TNC |
3.1.2 d) |
||
Harmonised procedures applied when using the transmission system, including the definition of key terms. | TNC |
Definitions - point 1
|
3.1.2 e) |
||
Provisions on capacity allocation, congestion management, and anti-hoarding and re-utilisation procedures. | TNC | Capacity allocation (PP) - point 7 Congestion management - point 19 Contractual congestion management - point 19.4 |
3.1.2 f) |
||
Rules applicable to capacity trade on the secondary market as regards the transmission system operator. | TNC | Secondary market - point 19.6 |
3.1.2 g) |
||
Balancing rules and methodology for the calculation of imbalance charges. | TNC | Transmission system balancing - point 14 Commercial balancing - point 18 |
3.1.2. h) |
||
Flexibility and tolerance levels included in transport and other services without separate charge, as well as any flexibility offered in addition thereto and the corresponding charges. | TNC | Excess imbalance charges - point 18.3.6 |
3.1.2 i) |
||
Detailed description of the gas system managed by the transmission system operator and its relevant points of interconnection points and names of the operators of the systems or facilities connected in this way. |
System characteristics |
|
3.1.2 j) |
||
Rules applicable for connection to the system operated by the transmission system operator. |
TNC | Connection service - point 5 |
3.1.2 k) |
||
Information on emergency mechanisms. | TNC | Emergency situations - point 21 |
3.1.2 l) |
||
Procedures agreed upon by transmission system operators, relevant for the access of network users to given transmission systems and related to interoperability of networks at interconnection points, agreed procedures and used methods concerning submitting nominations and checking their compliance and other agreed procedures defining principles and used methods, which concern allocation of gas flow and its balancing. |
Access to data for both Shipper and Interoperating System Operators is provided after logging in the Information Exchange System Information exchange - point 20 |
|
3.1.2 m) |
||
A detailed and comprehensive description of the methods and processes applied, including information on the parameters and key assumptions that were used to calculate the technical capacity. | Methodology for capacity determination | |
3.3. (4), (5) |
||
Capacity, nominations, renominations, actual gas transmitted, gross calorific value. |
Capacity, nominations, renominations, actual gas transmitted |
|
3.3. (1) f) |
||
Planned and actual interruptions for interruptible capacity. | ||
3.3. (1) g) |
||
Scheduled and unscheduled interruptions for firm services. | Information on scheduled and unscheduled events on the Transit Gas Pipeline System causing gas transmission limitations is published on the Gas Inside Information Platform | |
3.4 (1) u. (2) |
||
Information on secondary capacity trading. | ||
3.4 (3) |
||
Imbalance data | Each Shipper has access to its imbalance status by logging into the Information Exchange System. | |
3.4 (4) |
||
Cumulative daily forecasts of the maximum flexibility, the reserved flexibility level and the availability of flexibility in the market on the next gas day. | not applicable | not applicable |
3.4 (5) |
||
Data on the quantity of gas in the transmission system at the start of each gas day and the forecast quantity of gas in the transmission system at the end of each gas day. | ||
3.4 (6) |
||
User-friendly instruments for tariff calculation |
Regulation (EC) 715/2009 |
Link |
Additional information |
Article 18(4) | ||
Points of the transmission system subject to the public disclosure obligation |
Decision of the ERO President approving the updated list of relevant points (PL) |
|
Annex to Regulation 715/2009 |
Link |
Additional information |
3.1.2 a) |
||
Detailed and comprehensive description of the different services offered and the related charges. |
Detailed information on the services provided is available in the TGPS Network Code. |
|
3.1.2 b) u. c) 1. |
||
Applications for provision of the TGPS transmission service and for definition of the TGPS connection conditions, TGPS transmission contract and other important documents. | Applications Model contract Other documents |
|
3.1.2 c) |
||
TGPS Transmission Network Code and / standard conditions defining the rights and obligations of all network users. | TGPS Network Code | |
3.1.2 c) 2. |
||
Quality parameters of transported gaseous fuel. | Quality parameters | |
3.1.2 c) 3. |
||
Pressure requirements for all relevant points. | List of system points | |
3.1.2 c) 4. |
||
The procedure to be followed in the event of interruption of interruptible transmission service. | TGPS Network Code | The procedure is described in detail in point 8.3 of the TGPS Network Code |
3.1.2 d) |
||
Harmonised procedures applied when using the transmission system, including the definition of key terms. | TGPS Network Code |
Definitions - point 1
|
3.1.2 e) |
||
Provisions regarding allocation of transmission ability, congestion management and procedures to prevent capacity hoarding and procedures for capacity reuse. | TGPS Network Code | Terms of use Terms and conditions for the use of the TGPS the by Shipper - point 8 Congestion management - point 15 Contractual congestion management - point 15.3 |
3.1.2 f) |
||
Rules applicable to capacity trade on the secondary market as regards the transmission system operator. | TGPS Network Code | Secondary market - point 15.3.8 |
3.1.2 g) |
||
Balancing rules and methodology for the calculation of imbalance charges. | TGPS Network Code | TGPS balancing - point 14 |
3.1.2. h) |
||
Flexibility and tolerance levels included in transport and other services without separate charge, as well as any flexibility offered in addition thereto and the corresponding charges. | not applicable | not applicable |
3.1.2 i) |
||
A detailed description of the gas system managed by the transmission system operator and its relevant interconnection points and the names of the operators of the systems or facilities so connected. |
Transmission System overview - point |
|
3.1.2 j) |
||
Rules applicable for connection to the system operated by the transmission system operator. | TGPS Network Code | Connection service - point 6.2. |
3.1.2 k) |
||
Information on emergency mechanisms. | TGPS Network Code | Emergency situations - point 17 |
3.1.2 l) |
||
Procedures agreed upon by transmission system operators, relevant for the access of network users to given transmission systems and related to interoperability of networks at interconnection points, agreed procedures and used methods concerning submitting nominations and checking their compliance and other agreed procedures defining principles and used methods, which concern allocation of gas flow and its balancing. |
Access to data for both Shipper and Interoperating System Operators is provided after logging in the Information Exchange System Information exchange - point 16 |
|
3.1.2 m) |
||
A detailed and comprehensive description of the methods and processes applied, including information on the parameters and key assumptions that were used to calculate the technical capacity. | Methodology for determining the transmission capacity | |
3.3. (4), (5) |
||
TGPS transmission capacity, nominations, renominations, actual amount of transmitted gas, gross calorific value. |
TGPS transport capacity, nominations, renominations, actual volume of gas transported |
|
3.3. (1) f) |
||
Planned and actual interruptions for interruptible capacity. | ||
3.3. (1) g) |
||
Scheduled and unscheduled interruptions for firm services. |
Information on scheduled and unscheduled events on the Transit Gas Pipeline System causing gas transmission limitations is published on Gas Inside Information Platform |
|
3.4 (1) u. (2) |
||
Information on secondary capacity trading. | Secondary market | |
3.4 (3) |
||
Imbalance data | Each Shipper has access to its imbalance status by logging into the Information Exchange System. | |
3.4 (4) |
||
Cumulative daily forecasts of the maximum flexibility, the reserved flexibility level and the availability of flexibility in the market on the next gas day. | not applicable | not applicable |
3.4 (5) |
||
Data on the quantity of gas in the transmission system at the start of each gas day and the forecast quantity of gas in the transmission system at the end of each gas day. | ||
3.4 (6) |
||
User-friendly instruments for tariff calculation |