NTS Transmission Network Code
The Transmission Network Code (TNC) is a set of regulations established in accordance with Article 9g of the Energy Law, specifying in particular:
- rights and obligations of GAZ-SYSTEM and the System User,
- the conditions for offering the available transmission system capacity,
- the conditions for the provision of gaseous fuel transmission services,
- the processes necessary for the safe and efficient performance of gaseous fuel transmission services,
- the scope of cooperation of GAZ-SYSTEM with ISO (Interoperating System Operator), OPR (Billing Point Operator) and Customers.
Transmission Network Code 29
On 15 July 2024, by decision No. DRR.WRG.4322.1.2024.IWa, the President of the Energy Regulatory Office approved the Transmission Network Code concerning the Polish transmission system owned by Gas Transmission Operator GAZ-SYSTEM S.A. and set its effective date for 1 August 2024 at 6.00 a.m
Content of the amendment to the TNC
Archived versions
On 5 January 2021, by decision No. DRR.WRG.4322.4.2020.IWa, the President of the Energy Regulatory Office approved the Transmission Network Code concerning the Polish transmission system owned by Gas Transmission Operator GAZ-SYSTEM S.A. and set its effective date for 1 February 2021 at 6.00 a.m.
- Decision of the President of the ERO DRR.WRG.4322.4.2020.IWa (PL)
- TNC version 28 (PL)
- TNC 28 searchable version
- TNC 28 searchable version - consolidated text
On 15 December 2022, the President of ERO issued a Decision amending the Transmission Network Code (TNC). The amendment includes additional rules governing the provision of a gaseous fuel pressure reduction service and is effective from 1 January 2023, 06:00 a.m.
- Decision of the President of ERO of 15 December 2022 Nr DRR.WRG.4322.1.1.2022.Iwa (PL)
- The content of the amendment to the TNC.
On 13 April 2023, the President of ERO issued a Decision amending the Transmission Network Code (TNC). The amendment includes additional rules governing the provision of a gaseous fuel compression service and is effective from 1 Mai 2023, 06:00 a.m.
- Decision of the President of ERO of 13 April 2023 DRR.WRG.4322.1.1.2022.IWa (PL)
- The content of the amendment to the TNC
On 29th November 2023, the President of the Energy Regulatory Office issued a decision to amend the Transmission Network Code (TNC).
The amendment consists in approving the essential provisions of the contract for the provision of gaseous fuel transmission services, constituting Appendix no. 1 to the TNC.
The effective date of Appendix no. 1 to TNC is 1st April 2024 from 06:00 a.m.
Appendix no. 1 to the TNC – The essential provisions of the contract for the provision of gaseous fuel transmission services – does not impose any new obligations on the system users. It contains only a set of the essential provisions resulting from the TNC, the transmission contract, the General Terms and Conditions or the Tariff.
TNC version 27 (remained in force until 01.04.2020)
- Decision of the President of the ERO, DRR.WRG.4322.1.2019.AK1 (PL)
- TNC version 27 (PL)
- TNC version 27 (searchable version)
- Decision of the President of the ERO No. DRR.WRG.4322.1.2018.AK1 (PL)
- TNC version 26 (PL)
- TNC version 26 – searchable version
- Decision of the President of the ERO No. DRR.WRG.7129.9.2017.AK1 together with Revision Sheet No. 1/2017/025
- Decision of the President of the ERO No. DRR-43222(18)/2015/2016/AN/MP (PL)
- TNC version 25 (text before amendment No. 1)
- TNC version 25 searchable (consolidated text after amendment No. 1)
- Decision of the President of the ERO No. DRR-4322-1(4)/2014/AN (PL)
- TNC version 24 (PL)
- TNC version 24 searchable
- Decision of the President of the ERO No. DRR-4322-5(9)/2013/JBu (PL)
- TNC version 23
- TNC version 23 searchable
- Decision of the President of the ERO No. DPK-4323-88(8)/2012/2013/AŚK approving Revision Sheet No. 1/2012 0018 (PL)
- TNC version 18.1
- Revision Sheet No. 1/2012 0018 for the Transmission Network Code (TNC)
- Decision of the President of the ERO dated 24 July 2012 approving the TNC (PL)
- Decision of the President of the ERO No. DPK-4322-16(2)/2012/AŚK setting the effective date for the provisions of points 1-22 TNC for 1 January 2013 (PL)
- TNC version 18
- Decision of the President of the ERO No. DPK-7111-3(8)/2011/12 approving the Revision Sheet for TNC version 15 (PL)
- Revision Sheet for the TNC version 15 approved by the President of the ERO
- Decision of the President of the ERO No. DPK-7111-3(6)/2011/KK approving Part I and II of the TNC (PL)
- Part I- General conditions for using the transmission system
- Part II – Balancing and congestion management
- Part I - General conditions for using the transmission system (effective from 15.12.2009 until 30.09.2011)
- Part II - Balancing and System Congestion Management (effective from 01.09.2008 until 30.09.2011)
- Part I - General conditions for using the transmission system (effective from 01.09.2008 until 14.12.2009)
- Part II - Balancing and System Congestion Management (effective from 01.05.2008 until 31.08.2008) (PL)
- Part I - General conditions for using the transmission system (effective from 01.08.2006 until 31.08.2008)
- Part II - Balancing and System Congestion Management (effective from 01.08.2006 until 30.04.2008)
- Decision DPK-7111-6(1)/2008/MS changing the effective date of Part II of the Network Code (PL)
- Decision DPK-7111-10(1)/2008/MS approving changes to Part II of the TNC and their effective date (PL)
- Decision DPK-7111-17(2)/2009/MK changing the effective date of Part II of the TNC (PL)