Transmission infrastructure
Allocation of the quantities of gaseous fuel delivered by the Shipper at the entry point or received by the Shipper at the exit point correspond to the quantities specified in the approved nomination.

Allocation to Shipper under conditions described above is made by the TGPSO (Transit Gas Pipeline System Operator).