Construction of the Czeszów-Wierzchowice gas pipeline
Basic parameters and description of the project:
  • high pressure gas pipeline
  • diameter: 1000 mm
  • operating pressure: 8.4 MPa
  • length: approx. 14 km

Project status:
  • completed
  • permit to operate and commissioning of the gas pipeline in 2017
  • engineering phase completed with a building permit decision obtained in 2015
 
Project location:
The high-pressure gas pipeline between Czeszów and Wierzchowice is located in the Lower Silesia Voivodeship in the territory of the municipalities of: Zawonia and Krośnice.

Map of the Czeszów-Wierzchowice gas pipeline

Benefits

  • possibility to supply surplus gas quantities from Germany to the market,
  • diversification of natural gas supply to Poland,
  • connection of the Wierzchowice Underground Gas Storage to the Lower and Upper Silesian agglomerations,
  • improved energy security,
  • better overall reliability and operating flexibility of the gas transmission system in Lower Silesia and Opole regions.
The development of the connection is also crucial for connecting new sources of supply in north-western Poland, and offers the possibility of reversing the gas flow in the system as required.

The pipeline makes possible the conversion from solid fuels to natural gas, especially in cogeneration systems for heat and power production. This will reduce greenhouse gas and dust emissions into the atmosphere.

Contractors

  • ​​​​​​Design Engineer was: Tractebel Engineering S.A.
  • Building Contractor was:  PGNIG Technologie S.A.
  • Investor's Supervision Contractor was: Tractebel Engineering S.A.

Co-financing by the European Union

The project has been granted funding from the European Union under the Infrastructure and Environment Operational Programme 2014-2020.

The amount of funding granted for the project was over PLN 47 million.

Project of Common Interest (PCI)

The European Commission has granted the PCI (Project of Common Interest) status to the project. More information on the significance of the PCI status for the development of gas transmission infrastructure can be found in the  dedicated section on PCI projects.

While implementing its investment projects GAZ-SYSTEM S.A. took due care to respect the rights of all interested stakeholders. You are encouraged to submit feedback or comments, or to ask questions concerning any investment project which has been granted the PCI status using the Form for questions and comments concerning the implementation of projects with the PCI status by GAZ-SYSTEM.