Construction of the Tworóg-Tworzeń gas company
Basic parameters and description of the project:
  • high pressure gas pipeline
  • diameter: 1000 mm
  • operating pressure: 8.4 MPa
  • length: 55.2 km

Project status:
  • completed in March 2021
  • technical acceptance (2020) and permit to operate the gas pipeline obtained (January 2021)
  • engineering phase completed with all necessary approvals required for the building permit decision obtained in 2018

Project location:
For most part, the gas pipeline route runs along the existing high-pressure gas pipelines, through the the Silesian Voivodeship in following municipalities: Tworóg, Tarnowskie Góry, Miasteczko Śląskie, Ożarowice, Mierzęcice, Siewierz and Dąbrowa Górnicza.
Map of the Tworóg-Tworzeń gas pipeline

Benefits

The investment is expected to improve the safety and reliability of natural gas transmission in the region, and – on a national scale – increased transmission capacity and the degree of diversification of natural gas sources. In addition, the Tworóg – Tworzeń gas pipeline makes part of the North-South Gas Corridor.

Local communities will gain an important benefit of the revenue from the property tax to be paid annually by GAZ-SYSTEM S.A. at the rate of 2% of the value of the pipeline section located in the territory of a given commune.

Contractors

  • Design Engineer was: Tractebel Engineering S.A.
  • Building Contractor was: a consortium of PORR S.A. and Denys NV.
  • Investor's Supervision Contractor was: ECM GROUP POLSKA S.A.

Co-financing by the European Union

The project has been granted funding from the European Union under the Infrastructure and Environment Operational Programme 2014-2020.

The maximum amount of co-financing under the agreement reached nearly 219 million PLN.

Project of Common Interest (PCI)

The European Commission has granted the PCI (Project of Common Interest) status to the project. More information on the significance of the PCI status for the development of gas transmission infrastructure can be found in the  dedicated section on PCI projects.

While implementing its investment projects GAZ-SYSTEM S.A. took due care to respect the rights of all interested stakeholders. You are encouraged to send comments and questions concerning any project which was granted the PCI status using the Form for questions and comments concerning the implementation of projects with PCI status by GAZ- SYSTEM.