Racibórz – Rybnik
The Racibórz - Rybnik gas pipeline is the first stage of the Racibórz - Oswiecim gas pipeline .
The Racibórz - Rybnik gas pipeline is subsidized under the project “Construction of the Kędzierzyn-Koźle - Racibórz - Rybnik gas pipeline” from the European Funds for Infrastructure, Climate, Environment 2021 - 2027.
Basic parameters and description of the project:
Project status:
Project route and location:
The route of the gas pipeline runs through the Silesian province in the municipalities of: Racibórz, Nędza Kuźnia Raciborska, Lyski, Rybnik.
The Racibórz - Rybnik gas pipeline is subsidized under the project “Construction of the Kędzierzyn-Koźle - Racibórz - Rybnik gas pipeline” from the European Funds for Infrastructure, Climate, Environment 2021 - 2027.
Basic parameters and description of the project:
- high pressure gas pipeline,
- diameter: 700 mm,
- operating pressure: 8.4 MPa,
- length: approx. 38.7 km.
Project status:
- the design stage of the investment has been completed and a set of construction permit decisions has been obtained,
- construction of the gas pipeline is in progress,
- planned completion date of the investment - Q2 2026.
Project route and location:
The route of the gas pipeline runs through the Silesian province in the municipalities of: Racibórz, Nędza Kuźnia Raciborska, Lyski, Rybnik.
- 21.03.2024 - GAZ-SYSTEM invites to informational meetings on the construction of the Racibórz – Oświęcim gas pipeline Stage I Racibórz – Rybnik.
Date | Venue |
05.04.2024 16:00 – 18:00 |
Urząd Miasta Racibórz ul. Króla Stefana Batorego 6 47-400 Racibórz Sala Kolumnowa |
09.04.2024 16:00 – 18:00 |
Urząd Gminy Nędza ul. Jana III Sobieskiego 5 47-440 Nędza Sala Narad |
10.04.2024 16:00 – 18:00 |
Urząd Gminy Lyski ul. Dworcowa 1a 44-295 Lyski Sala przy Urzędzie |
During the meetings we will present information about the investment, its stages and timetable, occupation of property for the duration of construction and operation of the gas pipeline, compensation.
Invitation to informational meetings (PL)
Invitation to informational meetings (PL)
Most importantly, the planned investment project will increase the region’s attractiveness by enabling access to gas transmission infrastructure and creating conditions for connecting new customers, specifically from the power sector, to the transmission network. The development of the transmission system will also significantly improve security of gas supply in southern Poland.
Local communities will gain an important benefit of the revenue from the property tax to be paid annually by GAZ-SYSTEM S.A. at the rate of 2% of the value of the pipeline section located in the territory of a given commune.
Local communities will gain an important benefit of the revenue from the property tax to be paid annually by GAZ-SYSTEM S.A. at the rate of 2% of the value of the pipeline section located in the territory of a given commune.
The project is implemented on the basis of the provisions of the Act of 24 April 2009 on investments in regasification terminal for liquefied natural gas in Świnoujście (for consolidated text see Journal of Laws of 2021, item 1836).
Environmental decision
On 25 August, 2021, the Regional Director of Environmental Protection in Katowice issued the decision (WOOŚ.420.29.2020.JKS.59) on the environmental conditions for the project named “Construction of high-pressure gas pipeline DN700 MOP 8.4MPa from Racibórz to Oświęcim together with the infrastructure necessary for its operation and the construction of the Pressure Reduction and Measurement Station SSRP Suszec together with a DN300 branch-off pipeline.”
Decision establishing the location
Silesian Voivodeship
On 16 March 2022 the Silesian Voivode issued decision no. 5/2022, sing IFXIII.747.26.2021 establishing the location of the project named: “Construction of the high-pressure gas pipeline DN700 MOP 8.4MPa from Racibórz to Oswiecim together with the infrastructure necessary for its operation and the construction of the System Reduction and Measurement Station SSRP Suszec together with a branch DN300 in the Śląskie Voivodeship".
Construction permit
Silesian Voivodeship
On October 25, the Silesian Voivode issued Decision No. 66/22 approving the land development project and the architectural and construction project and granted a permit covering the investment project entitled: "Construction of a high-pressure gas pipeline DN700 MOP 8.4MPa from Racibórz to Oświęcim together with the infrastructure necessary for its service and the construction of the System Reduction and Measurement Station SSRP Suszec together with a DN300 branch. Section L1 SNO Stańkowice - ZZU Ochojec".
On 25 August, 2021, the Regional Director of Environmental Protection in Katowice issued the decision (WOOŚ.420.29.2020.JKS.59) on the environmental conditions for the project named “Construction of high-pressure gas pipeline DN700 MOP 8.4MPa from Racibórz to Oświęcim together with the infrastructure necessary for its operation and the construction of the Pressure Reduction and Measurement Station SSRP Suszec together with a DN300 branch-off pipeline.”
Decision establishing the location
Silesian Voivodeship
On 16 March 2022 the Silesian Voivode issued decision no. 5/2022, sing IFXIII.747.26.2021 establishing the location of the project named: “Construction of the high-pressure gas pipeline DN700 MOP 8.4MPa from Racibórz to Oswiecim together with the infrastructure necessary for its operation and the construction of the System Reduction and Measurement Station SSRP Suszec together with a branch DN300 in the Śląskie Voivodeship".
Construction permit
Silesian Voivodeship
On October 25, the Silesian Voivode issued Decision No. 66/22 approving the land development project and the architectural and construction project and granted a permit covering the investment project entitled: "Construction of a high-pressure gas pipeline DN700 MOP 8.4MPa from Racibórz to Oświęcim together with the infrastructure necessary for its service and the construction of the System Reduction and Measurement Station SSRP Suszec together with a DN300 branch. Section L1 SNO Stańkowice - ZZU Ochojec".
Under a special act regulating gas infrastructure projects, compensation payments are guaranteed to the owners of the land affected by the project development.
The compensation payment process is carried out in accordance with an administrative procedure, under the supervision of the competent Voivode. First, an independent expert is commissioned to carry out an assessment, which is the basis for determining the amount of compensation. Upon completion of the construction process, the Voivode issues an administrative decision specifying the amount of compensation due.
For more information about the compensation payments and construction process see the section For Landowners.
The compensation payment process is carried out in accordance with an administrative procedure, under the supervision of the competent Voivode. First, an independent expert is commissioned to carry out an assessment, which is the basis for determining the amount of compensation. Upon completion of the construction process, the Voivode issues an administrative decision specifying the amount of compensation due.
For more information about the compensation payments and construction process see the section For Landowners.
Design engineer:
Gas Transmission Operator GAZ-SYSTEM S.A.
Biuro Projektowe
ul. Gazowa 3
50-513 Wrocław
phone number. +48 885 884 120, +48 669 095 477
Investor:
Gas Transmission Operator GAZ‑SYSTEM S.A.
Oddział w Świerklanach
ul. Wodzisławska 54
44‑266 Świerklany
phone number. 32 439 25 00
e‑mail: komunikacja.swierklany@gaz-system.pl
Construction Contractor stage Racibórz - Rybnik:
ZRUG Sp. z o.o.
ul. Stanisława Taczaka 13/3
61-819 Poznań
Construction office:
ZRUG Sp. z o.o.
ul. Przemysłowa 13 I piętro
44-203 Rybnik
phone. number: 602 228 903
biurorybnik@zrug.pl
Investor's Supervision Contractor stage Racibórz - Rybnik:
ECM Group Polska S.A.
ul. Rondo ONZ 1,
00-124 Warszawa
Contact office:
ECM Grupa Polska S.A.
ul. Podmiejska 95
44-207 Rybnik
phone. number: 538 998 082
e-mail gs.raciborz@ecmg.pl
Gas Transmission Operator GAZ-SYSTEM S.A.
Biuro Projektowe
ul. Gazowa 3
50-513 Wrocław
phone number. +48 885 884 120, +48 669 095 477
Investor:
Gas Transmission Operator GAZ‑SYSTEM S.A.
Oddział w Świerklanach
ul. Wodzisławska 54
44‑266 Świerklany
phone number. 32 439 25 00
e‑mail: komunikacja.swierklany@gaz-system.pl
Construction Contractor stage Racibórz - Rybnik:
ZRUG Sp. z o.o.
ul. Stanisława Taczaka 13/3
61-819 Poznań
Construction office:
ZRUG Sp. z o.o.
ul. Przemysłowa 13 I piętro
44-203 Rybnik
phone. number: 602 228 903
biurorybnik@zrug.pl
Investor's Supervision Contractor stage Racibórz - Rybnik:
ECM Group Polska S.A.
ul. Rondo ONZ 1,
00-124 Warszawa
Contact office:
ECM Grupa Polska S.A.
ul. Podmiejska 95
44-207 Rybnik
phone. number: 538 998 082
e-mail gs.raciborz@ecmg.pl